JG Excavator Promotion AD show in China High Speed Train

JG Excavator Promotion AD show in China High Speed Train, this tran will bring us to the spring of Jinggong machinery.

JG80L railway sleeper changer is a patented product with independent intellectual property rights of our company. Its technical level has reached the domestic leading level. The main components are well-known brand products, a full set of imported hydraulic systems, and the key parts of structural parts are strengthened. The power and operation of the whole machine Efficiency, maximum pillow grip, walking traction, and efficient and flexible advantages in actual operations.

railway excavator

JG80L railway sleeper changer has the characteristics of novel structure, easy operation, high efficiency of sleeper replacement operation, high construction safety and stronger practicability. The replacement of sleepers on rails is mainly carried out manually. Since the sleepers are made of reinforced concrete, the weight is up to 400-500 kg. The manual replacement of sleepers will have the problems of high labor intensity, low operating efficiency, and low construction safety. 

The railway sleeper changer can greatly improve the efficiency of sleeper replacement, high construction safety, low construction cost and strong practicability. Manually changing pillows for 3 hours can only change 2 sleepers, and the working length is 1.2 meters; this equipment can work on an average of 20 sleepers per hour/person. 

ballast tamping

The efficiency of changing pillows is 30 times that of labor, which can liberate a large amount of labor and greatly reduce labor. Manage costs and improve operational safety.


Get the latest price? We'll respond as soon as possible(within 12 hours)

Privacy policy